Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br />Project: Waste Coal Pile Project No.: 95-2296 <br />Location: Foidel Creek Mine Report No.: 29 <br />Client: Bower Brothers Construction <br />Work Performed: <br />Date: 10/15/97 <br />Time: 2.0 <br />Mileage: 20 <br />Engr.fTech: JK <br />As requested, we visited the project site on this date to conduct nuclear density test No.'s 121 through 124 on the <br />processed waste coal placed and compacted in the south end of Area #1. We obtained moisture samples from <br />each test location and returned them to our Laboratory. <br />We also ran a checkpoint Proctor on a bulk sample obtained from the test sites. The checkpoint matched Proctor <br />curve No. 2. <br />Remarks: <br />Compaction of the material ranged from 94% to 97% and moisture contents ranged from 0.1% to 2.2% above <br />optimum. <br />Please refer to the attached sheet for the results of today's testing. <br />Verbal Discussions: <br />Bud Bower of Bower Brothers Construction was informed of today's test results. <br />