My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP21126
DRMS
>
Back File Migration
>
Report
>
REP21126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:54:39 PM
Creation date
11/27/2007 3:04:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992051
IBM Index Class Name
Report
Doc Date
8/5/1997
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112C CONSTRUCTION MATERIALS ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ : ; <br /> <br /> <br /> <br /> RECEIVE D <br /> Notice of Intent to Continue Mining Operations <br /> 112c Construction Materials Annual Report <br /> AUG U ~ 1997 <br />Permit tee Name: Florence Sand & Gravel <br />Permit No. M-92-051 <br />Operat ion Name: Florence Sand & Gravel Pit Division ofMineraisdlieoio <br />Annive rsary Date: August 11, 1997 9Y <br />Tota:L: $550.00 (Due on your Anniversary Date) <br />1. a. Permitted acreage: T n b. County where mine is located: ~v2YrLO~JT <br />2. Has this mine been granted TEMPORARY CESSATION STATUS? YES <br /> Does this mine operate MORE or LESS than 160 days per year? MORE LE <br /> <br />3. Does this mine have a phased reclamation plan? p NO <br />4. Total acres affected during the report year:* ~~ <br />5. Total acres reclaimed for the report year:* <br />6_ Total number of acres in topsoil replacement stage_ b <br /> a. Average thickness of topsoil replaced: <br />7. Total number of acres seeded: <br /> a. List species seeded & seeding rate for report year on back <br />8. For non-phased operations provide dates extraction ceased: ~~ <br /> a. Date reclamation began: <br />9. The type and approximate quantity of fertilizers, organic material or soil <br /> conditioners used for the report year:* ~/~ <br />10. Estimated total acres to be affected in th <br />e <br />next report year:* 5 <br />11. // <br />~~ <br />COMMENTS: 1'~:S 64'~~~:oS TD DPw,~od r l/~96 ~ ~ I/~/~7 <br />* Please show the location of the acreage for items 4 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated with <br />your timetable. For phased operations show dates extraction ceased and dates <br />reclamation began. <br />** N(YPE: If there have not been any changes since the last annual report and you <br />prey ~.ously submitted a map which correctly depicts the current acreage in items 2 <br />through 6, ~/th~Jen /a/~~new/~map is unnecessary. However, this must be stated above. <br />Signature: 1v~1 ~1 (T.YG Date: ~- y - ~7 <br />Plea:;e type or print current contact name, mailing address, and phone number below: <br />Contact Name: 10 ~ \1\ ,~ f~~ ,~vn.Q/ Phone: (7/9 ) 3>a -6oas <br />FAX NO: ( ) <br />Company: Teo r¢,cJ c.e Saab d- rr-Va-~~ <br />Address: X99 s-~ sr~• <br />1/.2.N)V`oSP Ca ~/ayo <br />Fedex-al Tax ID No. or Social Security No.: ~l T - ~a yO 6.>~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.