Laserfiche WebLink
as it leaves the mine area. ' <br />Nbnthly flow, pH, temperature, and c;onductiviiy measurements will betaken at the five monitoring <br />locations to assess potential impacts of the mine and to fulfill the requirements for the water <br />augmentation plan. Water quality parameters listed in Table 2.04.7-2 will be collected on a quarterly <br />basis for SW-102, and on asemi-annual basis forthe remaining four stations (SI/~N104, SV~FN105, <br />S1/~N108 and SV~N109). The discharge point at Pond 007 will also be monitored for NPDES <br />requirements. <br />y <br />'~ (Revised asssl 2.04.7-37 <br />