My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20985
DRMS
>
Back File Migration
>
Report
>
REP20985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:49:27 PM
Creation date
11/27/2007 3:01:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977376
IBM Index Class Name
Report
Doc Date
7/23/1991
Doc Name
NOTICE OF INTENT TO CONTINUE MINING OPERATIONS 112 ANNUAL REPORT
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~u! r«<ii~l~iiul« <br />Notice of Intent to Continue Mining Operations <br />112 Annual Report R~ (; E ~ v E~ <br />Permittee Name: CF & I Steel Corporation <br />Permit No: M-77-376 JUL 2 3 1991 <br /> <br />Operation Name: <br />Canon flolomite Quar ,~~~I <br />Anniversary Date: 09/22/91' Mine Land <br />Total: 5430,00 (Due on your Anniver~'~~t~~~ ~ Division <br />1. Has ,your mine been granted TEMPORARY CESSATION STATUS? YES <br />Does your mine operate MORE or LESS than 180 days per vear? MORE LESS <br />2. Total acres affected during the report .year:* <br />3. Total acres reclaimed for the report .Year:* <br />4. Total acres in various stages of reclamation:* <br />a. Backfilled: //l~ d, <br />b. Graded: i0 ipe <br />c. Seeded: 5 ~a <br />List species seeded & seeding <br />rate for report .year on back <br />ND/V Z C.OAq /L ~ TAO <br />Topsoil replaced: 7A~xEt <br />Average topsoil thickness <br />replaced: .3 " <br />Tnasac Sasr>i rdr6 <br />5. The type and approximate quantity of fertilizers, organic material or soil <br />conditioners used for the report year:* .S%[ r f -ito.y C'~o.v~oz <br />6. Estimated total acres to be affected in the next report ,vear:* ,(/p,//~ <br />7. COMMENTS: ,f'~~ ~,{cdjOru /yJ,epS <br />* Please show the location of the acreage for items 2 - 6 on your map**. <br />Indicate the phases of the reclamation which have been completed, correlated <br />with vour timetable. <br />NOTE: If there have not been any changes since the last annual report and <br />you previously submitted a map which correctly depicts the current ac reage in <br />items 2 through 6, then a new map is unnecessary. However, you must state this <br />fact above. <br />Signature: ~ ' Date: 7z2-9/ <br />Please type r print current contact name, address, and phone number below: <br />Contact Name: ~tFPtl $i,Aif Phone:, (7/9 )$G~ 7/30 <br />Company: CFt,T cSTL~FL Co~PngAY~e•~ / <br />Address: pp,$aK 3l(0 `// f~,~ <br />p~~ ~~o , Co ~IOOZ ,J°q,(T' ~a,~ <br />Federal Tax ID No. or Social Security No.: 8y- DI ]Z SOD n 1~ <br />l <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.