My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20882
DRMS
>
Back File Migration
>
Report
>
REP20882
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:49:22 PM
Creation date
11/27/2007 3:00:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Report
Doc Date
12/11/2001
Doc Name
WEST ELK MINE 2000 ANNUAL HYDROLOGY REPORT
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Coa/Company 2000 Annual Hydrology Report West E/k Mine <br />• <br />Table 6 <br />Underdrain and Mine Water Monitoring <br /> Water uali <br />Station Flow <br />Measurements Field Parameters Lab Analyses <br />LRP Underdrains~ 3 times per year 3 times per year Annually <br />RPE Underdrains' 3 times per year 3 times per year Annually <br />Mine Inflows' 3 times per year 3 times per year Annually <br />~ Field parameters include pH, conductivity, and temperature. <br />Annual analyses during the third sampling period include laboratory analyses o(pN, conductivity, total dissolved <br />solids (iDS), calcium, magnesium, sodium, SAR, hardness, bicarbonate, chloride, un-ionized ammonia, <br />nitrate/nitrite, phosphate (PO,' as P), sulfate, iron (total and dissolved), manganese (total and dissolved), arsenic, <br />cadmium, lead, mercury, selenium and zinc. All parameters were analyzed (or their dissolved forth unless stated <br />otherwise. <br />~ LRP and RPE Underdrain flows are sampled seasonally. <br />° Field parameters and a water sample will be obtained (and parameters per (oomote ill analyzed) if the inflow is <br />of sufficient dtscemable flow (>5 gpm) and/or lasts longer than 7 days. If the inflow is continuous, an initial <br />sample will be obtained, and then sampled at least annually thereafter. <br />• <br />• <br />83l -032.550 Page 13 Wright Water Engineers <br />
The URL can be used to link to this page
Your browser does not support the video tag.