My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20816
DRMS
>
Back File Migration
>
Report
>
REP20816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:49:19 PM
Creation date
11/27/2007 2:58:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983058
IBM Index Class Name
Report
Doc Date
6/7/1988
Doc Name
TWIN PINES 2 MINE PN C-058-83
From
TWIN PINES INVESTMENT LIMITED PARTNERSHIP
To
MLRD
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Developement of the main entries has now progressed to the area predicted <br />for the Chandler Syncline. The intake entry has encountered considerable <br />moisture in development, creating a muddy floor and a generally wet <br />working environment. The water is not measureable at this time. A defini- <br />ate dip in the coal seam is apparent crossing the main entry and the belt <br />entry at a strike of S 64 E. The approximate location is shown on the <br />drawings. Water is accumulating in this dip. In the intake entry a shear <br />zone, running parallel to the entry inby of the dip, has been encountered. <br />The shear zone is producing water. No apparent displacement has been <br />noticed in the face. <br />Water level measurements and associated data for the water monitoring <br />wells for the reporting period are as follows: <br />TPW-1 CALDIROLA NO. 2 <br />DATE: 12/3/87 2/27/88 4/19/88 12/3/87 2/27/88 4/19/88 <br />CONDUCTIVITY 780 800 820 660 640 '700 <br />PH B.5 8.5 8.2 7.5 7.4 7.5' <br />LEVEL 146.5 147.5 144.1 83.5 85.6 83:0 <br />TEMPERATURE 54 F 52 F 53 F 52 F 52 F 52 F <br />The water level in well No. TPW-1 decreased 1.0 ft. from 12/3 to 2/27 and <br />increased 3.4 ft. from 2/27 to 4/19. The levels cannot be correlated with <br />the water pumped from the mine but appear to be normal seasonal varia- <br />tions. <br />Samples for the water quality analysis of well no. TPW-1 were taken in <br />April The results of the analysis is enclosed. - <br />Respec i ely s fitted, <br />is Reed esident <br />TWIN PINES INVESTMENT LIMITED PARTNERSHIP <br />FALCON ENERGY INC., GENERAL PARTNER <br />ENCLOSURES: <br />1. MINE MAP, updated 4/28/88 <br />2. ENLARGED MAP OF WORKING SECTION, dated 4/26/86 <br />3. A SUMMARY OF WATER QUALITY ANALYSIS FOR TPW-1 <br />4. LABORATORY TEST RESULTS FOR TPW-1 AND MINE WATER <br />5. DAILY PUMPING LOG <br />6. SAMPLE LOG FOR MINE WATER DISCHARGE <br />7. NPEDS DISCHARGE REPORTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.