My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20788
DRMS
>
Back File Migration
>
Report
>
REP20788
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:49:18 PM
Creation date
11/27/2007 2:58:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Report
Doc Date
2/14/1986
Doc Name
1985 AHR AND MINE INFLOWS MAP
From
BLUE RIBBON COAL CO
To
MLRD
Annual Report Year
1985
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discharge point to discharge mine water directly to Hubbard Creek. Discharge <br />point 004 was established in a new permit issued September 26, 1985. Discussion <br />of this discharge is given in the Mine Water portion of this report. <br />The only spring monitored during the year was in the draw north of the mine. There <br />was measureable flow in June, July and November. The quality of this water as <br />measured by conductivity appears to be similar to other ground water near by, <br />especially the north bench underdrain. <br />GROUND WATER <br />The well near the 111 pond was not used during 1985 therefore no sampling was done. <br />Piezometers P-1, P-2 and P-3 were installed on the middle bench of the restabilized <br />mine bench on June 26, 1985. These piezometers are located near the design location <br />shown in the bench monitoring plan submitted to the Division April 30, 1985. A <br />fourth piezometer, P-4, was installed November 6, 1985 on the top edge of the <br />bench near S-6. The following information further describes these piezometers: <br /> Top of htax Bottom <br /> Ground Pipe Bottom Excavation Perforated <br />Piezometer Elevation Elevation Elevation Elevation Length <br />P-1 6399.7 6402.3 6374.5 6831 20' <br />P-2 6399.0 6399.0 6347.2 6350 45' <br />P-3 6383.6 6385.4 6332.9 6348 42' <br />P-4 6478.1 6480.0 6440.0 6453 32' <br />These piezometers were monitored monthly For water level since installed with <br />the following results: <br /> Average Average <br />Piezometer Water Level Elevation <br />P-1 21.2 6381.1 <br />P-2* 50.3 6348.7 <br />P-3 42.4 6343.0 <br />P-4 21.4 6458.6 <br />*Total depth of the hole used to calculate average water level when no water <br />found. The water level on P-1 through P-3 is at or below the level of the <br />coal waste placed in the bench. The water level on P-4 is 5.6' up into the <br />waste. <br />
The URL can be used to link to this page
Your browser does not support the video tag.