Laserfiche WebLink
<br />~~l~` ~.~ ~; ' ANNUAL REPORT <br />,~; i~ ~'~ ~ INSTRUCTIONS <br />According to C.R.S. 34-32-116(3), and C.R.S. 34-32.5-116(3)(a), on the anniversary date of the permit each year, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land, <br />reclamation accomplished to date and durine the preceding year, new disturbances that are anticipated to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />:t report and map to enclosed annual report'form. (An adequately labelzd map that clearly dzlinea[es and includes <br />the above elements may suffice for a written report.) <br />If your operation is subject to the provisions of Temporary Cessation az defined in the Act and Rules, you must <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Rules <br />1.13.7(I)(a): <br />(I) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented-to comply with'reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are part of your <br />approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following information with your Annual Report, az applicable: <br />(a) Per the requiremenu of 2 CCR 407-1, 407-4, and Rules 1.1(1), provide an updated statement <br />regarding the sufficiency of the value of t;te Financial Warranty, sl•~ciitcaily: <br />(I) Per the requirements of 2 CCR 407-1, 407-4, and Rules I.15(1)(a), provide an updated <br />statement regarding the sufficiency of the value of the financial warranty. Specifically, <br />itrevocable letters of credit, Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixmres. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and the value of the property subject to either of these inswments. <br />The report shall also provide proof that there are no past-due property taxes. <br />. _ _ ~. (iii) Per the.requirements oft CCR 407-1, 407, and-Rules 4.?(3), permits secured with an - -- <br />Irrevocable Letter of Credit, the.operator shall have cite bank provide documentation in the fortn <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent (]0%) of the bank's capital surplus accounts. <br />(vi) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(I)(c), all monitoring information <br />required as part of [he approved permit application, to include the Environmental Protection Plan. <br />(Pleaze note that if you are no[ a Designated Mining Operation, you will not have an Environmental <br />Protection Plan as part of your approved permit.) <br />