Laserfiche WebLink
Mamfi 2004 Kerr Coil Carp+rry * 2003 Arawnl Hylida~yRepnrt * COPemit Nn G84006 ~ Paxe 17 <br />7.0 LOADOUT AREA SURFACE WATER <br />• Two loadout surface weer sites (319 and 320) were monitored weekly from March through June, <br />then monthly for the other months through October. There was no recorded discharge from Site <br />319. Limited discharge from Site 320 occurred during the month of May. The sedimentation pond <br />associated with Site 320 filled during spring runoff and retained some water through October. Site <br />locations are shown on Map 2, LoxtlartArsz MaatorirgStatiwa. <br />As of January 1999, the monitoring program for surface discharge points was reduced to monthly <br />monitoring for a parameter list including only flow, temperature, pH, settleable solids, and oil and <br />grease. Onlythe field measurements (flow, temperature and pH) are required for Site 320. This data <br />is contained in Appendix A, 2003 Fie'dData and is snmmari~Pd in Table 6, 2003 Surface Water Data - <br />L cndactt Arat Surface Statiwa. Figure 6, Florr~arri pH - Statiat 320, shows the variation in flow over the <br />weekly measurements az station 320, along with the monthly pH readings. <br />Surface wazer sites 316, 317, and 318 were dropped from monitoring as of October 1999. No data <br />was collected from these sites during the 2003 water year. <br />• <br />• <br />MIYrH * 1475 Pve GroreRd, Ste 109, * Stevr~art Sp~v~s, Co(audo 80477 * (970) 879-6260 Reu 11/04 <br />w~ wa~.~. mnes~u...drr„eoagmvro~vam x~edmrym <br />3/19/Oa ~Ib <br />