<br />Phase II <br />Phase II Mining will mine about 257,000 tons ofgravel (Table 1). Phase B wetland mitigation <br />area will be constructed towards the end of this mining phase. The 2.8 acres of wetland <br />vegetation and soils occurring in Mining Phase III (proposed Phase C wetland mitigation) project <br />area (Appendix B, W-1) will be moved to the 5.5-acre constructed wetland bench (800' x 350') <br />along the northwest side of Phase II Mining area. Bench substrate will be constructed with <br />backfilled subsoil and topsoil covered with wetland material transferred from the 2.8 acres. Bench <br />sloping and design will be similar to the constructed wetland in the Phase I area (Appendix B, DS- <br />2). <br />Phase III-IV <br />Phase III Mining area contains the largest acreage of wetlands requiring a split mitigation effort <br />between Mining Phases IV and V to supply enough overburden for bench construction. Gravel <br />mined from Phases III and IV total approximately 396,000 tons ofgravel (Table 1). Wetland <br />mitigation in this period proceeds under Phases C and D with benches being completed as <br />overburden becomes available (Appendix B, W-1). Mining and bench construction in these areas <br />follow similar procedures used for Phase B. Excavated wetland material will be spread evenly <br />over surface to form bench substrate. Wetland mitigation in Phase III Mining area proceeds <br />eastward from area C and is completed by removing the two elongated wetlands north of this area <br />and placing them in area F under Mining Phases III and IV. <br />Phase III-V <br />Under Phases III and V, approximately 629,000 tons ofgravel will be mined (Table 1). Removed <br />overburden will be used to complete constructed wetland benches in the Phase III sector under <br />Phases E and F. Total mitigation efforts under Phases C-F will result in 8.6 acres of constructed <br />wetlands replacing the 5.5 acres of excavated wetlands. This breakdown of excavated wetlands <br />to constructed wetlands is as follows: 1.9 acres of wetlands from Mining Phase III (proposed <br />Phase D wetland mitigation) into the 3.7-acre constructed wetlands bench (340' x 470') in Phase <br />C; 1.46 acres of wetlands from Mining Phase III (proposed Phase E wetland mitigation) into a <br />2.18-acre bench (340' x 280') in Phase D; 0.85 acres residing in Mining Phase III (proposed Phase <br />F wetland mitigation) forma 1.7-acre bench (340' X 220') in Phase E and; the 1.0 acre excavated <br />from the two elongated wetlands (north and contiguous to Mining Phase III) placed in Phase F <br />forming about 1.2 acres (Appendix B, W-1). <br />The remaining site wetland acreage requiring mitigation is located in the Phase V Mining area. <br />During mitigation Phase G approximately 0.5 acres of wetlands will be excavated using wetland <br />soils and vegetation to create a 0.75-acre constructed wetland bench located north of pit abutting <br />undisturbed riparian area (Appendix B, W-1). Bench design and construction will be similar to <br />other reconstructed wetlands with substrate elevation corresponding to saturated conditions <br />conducive to sustaining wetlands. <br />2-4 <br />