Laserfiche WebLink
~~~ Geo-Con <br />r1 <br />~J <br />DAILY INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 10/19/2006 S M T W ®F S Weather: Smw Temp: 24-35 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) = S,O4S.O <br />TOTAL AREA TO DATE (S19 = 9,975.0 <br />BENTONITE FOR SLURRY TODAY (BAGS'7'ONS) = 14.0 / Z 1.O <br />BENTOMTE FOR SLORRY TO DATE (BAGSITONS) = 45.0 / 7Z.O <br />BENTONITE FOR DRY ADDITION TODAY(BAGSffONS)= S.O / ZS <br />BENTOMTE FOR DRY ADDITTON TO DATE (BAGS?ONS) = 9.0 / 13.5 <br />WATER USAGE AT BATCH PLANT (GAL TODAY/f0 DATE) ' 15,04$ / 193,74$ <br />2. Results of Inspection: See Attached <br />3. Tests Required by Plans and/or Specs and Results: See Attached <br />Less than full shift; rat aU tests wmpleted <br />• 4. Verbal InstruMions Received: <br />S. Remarks: <br />Dug 200' of tremh <br />Continue excavation of the slurry wall. <br />6. Safety; No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material aM equipmemt used, work performed and test wmducted durimg this reporting period were in <br />strict compliance with the contract plans amd specifications except as rated. <br />Geo-Con <br />Inspector/ Engineer/ Owner <br />• <br />Page 1 of t <br />