~~~ Geo-COD <br />• DAILY INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. P05-003 <br />Date: 11/6/2006 S ®T W R F S Weather: Sunrry Temp: 19-77 <br />1. Work Performed: Summary, see addition attached <br />AREA TODAY (SF) _ ~ 6,770.0 <br />TOTAL AREA TO DATE (SF)= 31,71 S.O <br />BENTONTI'E FOR SLURRY TODAY (BAC47'ONS) = I $.O / 22.5 <br />BENTONITE FOR SLURRY TO DATE (BAfS?ONS) ~ 101.0 / 1 S I .S <br />BENTONI'rE FOR DRY ADDr110N TODAY BAGSlrONS) = 4.O / 6.O <br />BENTONrI'E FOR DRY ADDITION TO DATE (BAGSrPONS) = 9Z.O / 13$.0 <br />CEMENT FOR DRY ADDITION TODAY"(BAGS?ONSp ~.~ ~ ~.~ <br />CEMENT ADDITION TO BACKFH.L TO DATE (BAGS?ONSp 17.0 21.3 <br />WATER USACE AT BATCH PLANT (GAL TODAYlfO DATE) 103,2$1 / $19,486 <br />• 2. Results oflnspection: See Attached <br />3. Tests Required by Ptans and/or Specs and Results: See Attached <br />4. Verbal Instructions Received: <br />5. Remarks: Started digging m both trenches. <br />D. Gayer started led in and dug 100'. <br />D. Wren dug 190' <br />No backfiB placed <br />Slurry was made and backfill placed in cotaatttinated trench over the past week since gas lice break <br />The section of shrrry wall from 18+15 to 18+50 was completed w6tle excavation was opered for pipeline repau <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material and equipruem used, work performed and test conducted during this reporting period were m <br />strict compliance with the comract plare and specffications except as rated. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page 1 or t <br />