Laserfiche WebLink
~~~ Geo-COD <br />• DAII.Y INSPECTIONlQUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 10/28/2006 S M T W R FQ Weather: Simtry Temp: 34-65 <br />I. Work Performed: Stunmarv. see addition attached <br />AREA TODAY (SF) = 4, I SS.O <br />TOTAL AREA TO DATE (SF) = 24,94$.0 <br />BENTONITE FOR SLURRY TODAY (BAGSlI'ONS) = O.O / O.O <br />BENTONITE FOR SLURRY TO DATE (RAG.SrrONS) = 70.0 I I US.O <br />BENTONITE FOR DRY ADDCr10N TODAY (BAGSfI'ONS) = O.O / O.O <br />BENTONITE FOR DRY ADDI7ION TO DATE (BAGSII'ONS) = 21.0 / 31.5 <br />CEMENT FOR DRY ADDrf10N TODAY (BAGSfrONSp 8.O ~ I O.O <br />CEMENT ADDITION TO BACKFIII. TO DATE (BAGS/1'ONSp H.O I O.O <br />WATER USAGE AT BATCB PLANT (GAL TODAY/r0 DATE) O / 338,763 <br />2. Results of Inspection: See Attached <br />• 3. Tests Required by Plans and/or Specs and Results: <br />Less than fu0 shift; mt all tests completer <br />4. Verbal Instructions Received: <br />S. Remarks: <br />Dug ISO'oftrench <br />Contime excavation of the slurry well. <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material and equipment used, work performed and test conducted during this reporting period were in <br />strict compliance with the contract plate and specification except as cored. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page t er 1 <br />