My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20629
DRMS
>
Back File Migration
>
Report
>
REP20629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:49:10 PM
Creation date
11/27/2007 2:56:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 1 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ Geo-Con <br />DAII.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 10/27/2006 S M T W R~S WeaNer: Suety Temp: 26-56 <br />1. Work Performed: Stmtmary, see addition attached <br />AREA TODAY (SF) = 2,4I $.O <br />TOTAL AREA TO DATE (SF) = 20,790.0 <br />BENTONITE FOR SLURRY TODAY (BAGS/PONS) _ $.O / 12.0 <br />BENTONITE FOR SLURRY TO DATE (BAGSlrONS) m 70.0 / 1 OS.O <br />BENTONITE FOR DRY ADDCFION TODAY (BAGSlTONS) = 4.O / 6.O <br />BENTONITE FOR DRY ADDTTION TO DATE (BACSfrONS) = 21.0 / 31.5 <br />CEMENT FOR DRY ADDI170N TODAY (BAGS/rONS)= $.O l O.O <br />CEMENT ADDITION TO BACKFILL TO DATE (BAGS/fONS)= $.O I O.O <br />WATER USAGE AT BATCH PLANT (GAL TODAYlrO DATE) 46,000 / 338,763 <br />2. Results of Inspection: See Attached <br />• 3. Tests Required by Plans and/or Specs and Results: See Attached <br />Less than full shift; not all tests completed <br />4. Verbal Instructions Received: <br />5. Remarks: <br />50'oftrench <br />Continue excavation of the shary wall. <br />Removed 2 cemem plugs <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material and equipmerd used, work performed and test conducted during this reportitg period were in <br />strict compliatrce with the cetdract plans and specificazioos except as noted. <br />Geo-Con <br />Inspector/ EngineeN Owner <br />Page t of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.