Laserfiche WebLink
~~~ Geo-Con <br />DAII.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 10/27/2006 S M T W R~S WeaNer: Suety Temp: 26-56 <br />1. Work Performed: Stmtmary, see addition attached <br />AREA TODAY (SF) = 2,4I $.O <br />TOTAL AREA TO DATE (SF) = 20,790.0 <br />BENTONITE FOR SLURRY TODAY (BAGS/PONS) _ $.O / 12.0 <br />BENTONITE FOR SLURRY TO DATE (BAGSlrONS) m 70.0 / 1 OS.O <br />BENTONITE FOR DRY ADDCFION TODAY (BAGSlTONS) = 4.O / 6.O <br />BENTONITE FOR DRY ADDTTION TO DATE (BACSfrONS) = 21.0 / 31.5 <br />CEMENT FOR DRY ADDI170N TODAY (BAGS/rONS)= $.O l O.O <br />CEMENT ADDITION TO BACKFILL TO DATE (BAGS/fONS)= $.O I O.O <br />WATER USAGE AT BATCH PLANT (GAL TODAYlrO DATE) 46,000 / 338,763 <br />2. Results of Inspection: See Attached <br />• 3. Tests Required by Plans and/or Specs and Results: See Attached <br />Less than full shift; not all tests completed <br />4. Verbal Instructions Received: <br />5. Remarks: <br />50'oftrench <br />Continue excavation of the shary wall. <br />Removed 2 cemem plugs <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTIFICATION: I certify that the above report is complete and correct and that all <br />material and equipmerd used, work performed and test conducted during this reportitg period were in <br />strict compliatrce with the cetdract plans and specificazioos except as noted. <br />Geo-Con <br />Inspector/ EngineeN Owner <br />Page t of t <br />