My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20629
DRMS
>
Back File Migration
>
Report
>
REP20629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:49:10 PM
Creation date
11/27/2007 2:56:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982015
IBM Index Class Name
Report
Doc Date
9/13/2007
Doc Name
Part 1 of Daily inspection/quality control report
From
Carma Bayshore Ponds
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Con <br />• DAII.Y INSPECTION/QUALITY CONTROL REPORT <br />SOIL-BENTONITE SLURRY WALL <br />CARMA BAYSHORE PONDS, WELD COUNTY, COLORADO <br />GEO-CON PROJECT NO. POS-003 <br />Date: 10/21/2006 S M T W R F© Weather: Sumry Temp: 26-60 <br />1. Work Performed: Summ ,see addition attached <br />AREA TODAY (SF)= S,47S.O <br />TOTAL AREA TO DATE (SF) = 1$,37$.0 <br />BENTONITE POR SLURRY TODAY (BAG3,7'ONS) = 14.0 / 21.0 <br />BENTOMTE FOR SLURRY TO DATE (BAGS?ONS) = 6L.~ / 93.0 <br />BENTONITE FOR DRY ADDITION TODAY BAGSIfONS) _ $.0 / 7.$ <br />BENTONTTE FOR DRY ADDITION TO DATE (BAGS/1'ONS) = I7.O / 2S.S <br />CEMENT FOR DRY ADDrrtON TODAY (BAGS/fONS~ $.O l O.0 <br />CEMENT ADDITION TO BACKFO.L TO DATE ($AGS/FONS~ H.O I O.O <br />WATER USAGE AT BATCR PLANT (GAL TODAYlrO DATE) 96,641 / 292,763 <br />• 2. Results of Inspection: See Attached <br />3. Tests Regttired by Plans and/or Specs and Results: See Attached <br />4. VerballnstructionsReceived: <br />$. Remarks: <br />Dng 240' of trench <br />Coidvme excavation of the slurry wall. <br />Mechanical Problem with Cat375, rubber in o0 pan. No production unh7 10/27/06. <br />6. Safety: No Safety Issues. <br />CONTRACTOR CERTQ7CATION: I certify that the above report is complete and correct and that afl <br />material and equipmein used, work performed and test co~ucted during this reporting period were in <br />strict compliance with the corrtract plain and specifications except as mted. <br />Geo-Con <br />• Inspector/ Engineer/ Owner <br />Page 1 of t <br />
The URL can be used to link to this page
Your browser does not support the video tag.