Laserfiche WebLink
Bowie Resources Limited <br />Bowie No. 2 Mine <br />• <br />• <br />1999 Annual Hydrology Report <br />$_tZ C Gulch -Spring 12 <br />Elev. 7650 <br />For the Period Beginning 01/01/1999 and Ending 12/31/19! <br />Surface Water <br /> <br />Field Parameters 05/20/1999 06/29/1999 09/10/1999 11/19/1999 Base L1ne Min MaX AV <br />e <br />Flow Rate (gpm) I q.o o. of o.o o.o o.o o.o c.o o.o~ <br />(Water level wry Dry Ory Dry <br />pH (Standard Umis) <br />Conductivity (umhos/cm) <br />iTemperalure (C) <br />~ ~ <br />~~ <br /> <br />Lab Parameters <br />(Wet Chemistry <br />Alkalinity as CaCO (mg/I) j j ~ <br />Bicarbonate as CaCO (mg/I) I ~ <br />~ ~ ~ <br />Carbonate as CaCO (mg/I) ~ <br />Hydrowde as CaCO (mg/I) <br />Chloride (mg/I) <br />Conductivity (umhos/cm) <br />Nitrate (mg/I) <br />NitratelNitrite as N, dissolved (mgll) <br />Nitrite as N, dissolved (mg/I) <br />pH (Lab Units) <br />Hardness (mg/I) <br />Phosphate (mgll) <br />Phosphorous, ortho dissolved (mglq <br />Residue, Filterable (TDS) Q780 C (mg/I <br />Residue, NonFilterable (rSS) (mg/I) <br />Sodium Absorption Ratio in Water <br />Sulfate (mg/I) <br />(Metals ~ I <br />Aluminum, total recoverable (mg/I) ~ ~ ~ <br />Arsenio to~_~ tat recoverable (mg/I) ~ i <br />;Cadmium, total recoverable (mg/I) <br />Calcium, total recoverable (mg/I) <br />Copper, total recoverable (mglp ~ ~ ~ <br />,Iron, total recoverable (mg/I) ~ ~ ~ ~ <br />Lead, total recoverable (mg/I) ~ ~ ~ <br />'Magnesium, total recoverable (mg/p ~ ~ i <br />Manganese, total recoverable (mg/I) i ~ i ~ <br />Mercury, total recoverable (mglp ~ ~ I <br />I ~ _ <br />_ <br />Molybdenum, total recoverable (mgll) I <br />'Selenium, dissolved (mg/I) , <br />Sodium, dissolved (mg/I) i ~ ~ <br />Zinc, dissolved (mg/I) ~, ~ ~ <br />Organic Analysis i, _ <br />!Oil and Grease total recoverable (mg/I) ~ I <br />Required Dy current permit. <br />Baseline Information for Point 5-12 is dedvetl Imm events beginn,ng in 07/12/t9951hrough 05/0111997, a period of -2t months <br />• the monitonng point /or 5-12 (Spnng 12) is located along a switchback road Thal ascentls the Southern laong exposure of the canyon wall of the North Fork pl the Gunnison <br />River. Tnis roatl leads to the broad ridge which separates the Hubbard Creek antl Temor Creek drainage systems <br />Monitoring Point Table 4 <br />