Laserfiche WebLink
<br />` RECEI~~D <br />ANNUAL REPORT SEP 0 5 2006 <br />MAYDAY MINE M-1981-185 oiv <br />~~t~y <br />During the permit year Sep 6 2005-Sept 5 2006 the roads to the mine were repaired/ <br />maintained and the portals of 1 Level and 2 Level were opened. Mapping and <br />sampling was conducted underground. No underground workings were extended so ~ <br />no new map is included. <br />Work planned for the following year include the following: <br />- --1-LEVEL--= "fhe°workings-orrthis-Level-wiil'be'rehabiGtated-~roduc ion is p"-lanned-in <br />the northern portion of the old stoped area. <br />2 LEVEL The workings in this level will be rehabilitated as far as the intersection <br />of the crosscut with the MayDay vein. The raise to B sublevel should be <br />retimbered/re-laddered. Core drilling is planned in the vicinity of the 810 vein /winze <br />station and in the May Day vein area. The workings further east may be rehabilitated. <br />Lamb. The remaining stockpile at the Lamb area will be removed. The area may or <br />may not be reclaimed during this year. <br />John H Ferguson <br />