Additional Pages <br />2001 Annual Report <br />Fountain Pit <br />M-1982-155 <br />Schmidt Construction Company <br />Anniversary Date: December 31 <br />Overview of Permit Year: During the 2001 operating year there was a great deal of activity at this site, <br />far more than was expected. This was primarily due to the very active construction market throughout <br />the Colorado Springs area. Mining is proceeding eastward into the previously stripped land and <br />considerable new land has been stripped on the east and south sides of the pit. It is likely chat a <br />significant amount of additional land will need to be stripped during the next year. Of course, this all <br />depends on the amount of economic activity and associated market. <br />Annual Report Maps: The enclosed maps show the primary areas of disturbance and the type of <br />disturbance occurring in each area. The current maps reflect an updated portrayal of the operation zones <br />as based upon aerial photography taken before the preparation of the annual report. The reports are also <br />being prepared with the aid of GPS to locate key boundaries of disturbances. <br />Affected Lands: The amount of affected land has increased in the last year. The same processes of <br />operating the pit are being used as has been used in the past. This operation is quite similar to the way it <br />was last year, although larger. The only ocher significant change is the continued extension of the <br />conveyor so the plant does not need to be moved. <br />Revegetation: The site is stable and is not subject to erosion. No additional revegetation was done in <br />the last year. Topsoil has been stockpiled around the north edge in preparation for final topsoiling of <br />the slope south of the stockpiles. <br />Expected Activity (2002): Mining will proceed eastward and especially southward into currently <br />stripped land and new, undisturbed land. With the acceleration in production, it is possible that 35 to 40 <br />new acres could be opened in the next year. <br />Bonding: This operation is covered by a self bond. During the last year, a bonding problem discovered <br />by the Division was corrected and a succession of operator transferred the operation from Centennial <br />Materials to Schmidt Construction (no substantive change; only procedural). Enclosed is a copy of the <br />most recent Divisional Balance Sheet for Schmidt Construction. Schmidt Construction is a subsidiary of <br />Edw. C. Lery Co. <br />Schmidt Construction Company 2001 Annual Report M-1982-155 Fountain Pit Page 1 of 1 <br />