Laserfiche WebLink
Bowie Resources Limited <br />Bowie #1 Mine <br />Quarterly Waste Disposal Area Inspection Report <br />1St Quarter - 1996 <br />Item Y/N Comments <br />1. Quantity of waste material added to No waste material has been added to the waste <br />waste disposal area this quarter? N disposal pile this quartEr. <br />2. Waste material deposited and No waste material has been added to the waste <br />compacted in 24' lifts? N disposal pile this quarter. <br />3. Drainage alterations constructed? No drainage alterations were constructed during the <br /> NA quarter. The existing drainage pattern was maintained <br /> around the perimeter of the pile to protect outslopes <br /> and direct drainage at the tce of the pile. <br />4. Present height of waste material? Highest height approximately 99.0 feet. <br />5. New bench contracted? <br /> N <br />6. Refuse material ouLSlopes placed at No waste material has been added to the waste <br />1 V:2H outslopes? NA disposal pile this quarter. <br />7. Adequate dranage on top of completed No waste material has been added to the waste <br />fill? NA disposal pile this quarter. <br />e. Bench drainage adequate? Bench drainage was maintained throughout the quarter. <br /> Y See Item 3. <br />9. Outsbpes covered with 4' non-toxic, No waste material has been added to the waste <br />non-combustible material? NA disposal pile this quarter. <br />10. Berms constructed on outsbpes? <br /> Y <br />11. Evidence of strucwral defects? <br /> N <br />12. Topsoil adequately salvaged and No additional topsoil was salvaged from this pile <br />stored? NA this quarter. <br />13. Trash removed? No waste material has been added to the waste <br /> NA disposal pile this quar~r. <br />14. Additional comments? Drainage control was monitored and maintained <br /> N throughout the 1st quarter of 1996. <br />I certify the above report as being accurate to the best of my knowledge. <br />"'~% <br />A_ , ../L ~ g.a.t~/_/_M~_ _ <br />Signature' <br />Date. ~ ~ " <br />~~~.,_ <br />