My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20423
DRMS
>
Back File Migration
>
Report
>
REP20423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:49:00 PM
Creation date
11/27/2007 2:52:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
4/1/1989
Doc Name
QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT NEW WEST RIDGE PILE
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,;, <br /> <br /> <br />COLORADO WESTMORELAND INC. <br />ORCHARD VALLEY MINE <br />QUARTERLY WASTE DISPOSAL AREA INSPECTION REPORT <br />NEW WEST RIDGE PILE <br />15%~ i ~ ~ <br />III IIIIIIIIIIIIIIII <br />ITEM YES NO COMMENTS <br />1, Quantity of waste material added to <br />waste disposal area this quarter. There has been no gob hauled to <br /> pit this last quarter because <br /> mining conditions have im- <br />(See attached calculations.) proved. There is no material <br /> being hauled to the wash plant <br /> or the gob pit. <br />2, Waste material deposited and compacted <br />in 24" lifts? X <br />3. Drainage alterations constructed? X <br /> Average south side height is 52 <br />4. Present height of waste material. ft. <br /> Have started on the 2nd bench ~ <br />{ level of pile 6 construction ofd <br />I <br />5. Nev bench constructed? X drainage ditch is underway. <br /> Cross sections of berm have <br /> been surveyed in and the pile <br /> was constructed at I:1-1 /2 <br /> slope instead of 1: 2. Present- <br />6. Refuse material outslope placed at ly working on options for <br />1V:2H? X rectifying roblem. <br /> No soil cover has been olaced <br /> <br />I as yet in the drainage ditch of <br />7. Top of completed fill a[ 5.6? X the second level. <br /> No erosion. Rock has been <br />8. Bench drainage adeoua[e? X cleared from drainage ditch. <br />9. Areas covered with 4 non-toxic non- 9 topsoil. <br />combustible material? X 3'3" subsoil. <br />10. Berms constructed on outdo es? X <br />11. Evidence of structural defects? X <br /> Subsoil 6 topsoil being removed <br />12. To soil adequatel salvaged 5 stored? from storage areas. <br /> No material added to pit this <br />13. Trash being removed? X ouarter. <br /> No material added to pit this <br />14. Additional comments? R ouarter_ <br />Inspector: <br />Date of Inspection: <br />03/22/89 <br />john H. Menke, III <br />I hereby certify that the construction of the waste disposal area was done under my direct <br />supervision and is constructed according to the above statements. <br />April 1 , 1989 <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.