My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20411
DRMS
>
Back File Migration
>
Report
>
REP20411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:59 PM
Creation date
11/27/2007 2:52:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981058
IBM Index Class Name
Report
Doc Date
7/1/1993
Doc Name
112 ANNUAL FEE INVOICE & REPORT REQUEST
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Mining Plan (continued) <br /> <br />' '~ The mining operation will consist of the following p ses: <br />~• ~ 1. Removal and ockpiling of topsoil. Topso' will be stripped <br />,• <br />with scraper a d dozers. Topsoil removed from Phase I area <br />will be stockpi din the processing si Topsoil in Phase II <br />i and III area will be stockpiled along he perimeter of the pit. <br />" 2. Excavation of the p run sand and ravel with front end <br />loader and backhoe, w ich will to the material into trucks <br />to be transported to t process' g site. <br />3. Crushing and Screening the pi run aggregate to make <br />marketable aggregate for ro base, asphalt cement and <br />~ concrete. <br />`~~ ~ Since the gravel pit is located a scent o the Colorado River, dewatering <br />"•~~i. will be required to mine the ful depth o the gravel. Dewatering will be <br />"~ - done in accordance with the reo irements of ur NPDES Permit. <br />~~_ ~' Topsoil over the site varies rom approximatel 3 inches to 1-1/2 feet. The <br />• _ -= topsoil cover is greater in hose II area and th least in Phase III. Gravel <br />-'== depth varies from 12 to 18 feet, with the underly~ g material being Mancos <br />• ~~~~ Shale. <br />_" ;~" I Mining will start in tp(e Fall of 1982. Total time req~ed to completely <br />deplete these gravel eposits is expected to take 8 to 1 years. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.