Laserfiche WebLink
<br />Proposed 1993 Monitoring <br />.n..:.ns:::ie:.s:'s:.:x:.aa::.::e:e:.::S:aJH.:..::a:.:avW'msn.ain n':.n`:::isC:R.:Y'C:.C:.::.C:.v'.`.YnLn:isL~:'3~'.`.::L::h~i~:.r:'C.S...:e::e..o:25^..a^e:..::.::<::......r...v..x..:.v .....:.........::~S:~Y'L:6:~nL:Y.:(:SL:x:a.'ecs. <br />' With the reclamation phase of the mine now complete, surfacewater Vmonitoring of water <br />' quantity will continue on a quarterly frequency and water quality sampling will continue on a <br />semiannual frequency with the same parameters. NPDES sampling and monitoring will be <br />continued as required by that permit. Anew NPDES permit (No. CO-G-850034) has been <br />' issued for the mine for the next five year period. Groundwater monitoring has also been <br />resumed in the alluvial aquifer at the site. Frequency will be quarterly for water levels and <br />semi-annually for water quality. <br />1 <br /> <br /> <br /> <br />1 <br />1 <br />1 <br /> <br />1 <br /> <br /> <br />1 <br /> <br />7 <br />1 <br />