My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20273
DRMS
>
Back File Migration
>
Report
>
REP20273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:51 PM
Creation date
11/27/2007 2:50:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
Report
Doc Date
2/11/1994
Doc Name
ANNUAL HYDROLOGIC MONITORING REPORT 1993
Permit Index Doc Type
HYDROLOGY REPORT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />t <br /> <br />1 <br /> <br />1 <br />Cracks or Slides No One small (1-inch wide, <br /> approximately 2 Ceet long) crack <br /> was noted near the crest <br /> (northeast upstream slope) <br />Seepage No <br />Other No Some small reduction in the <br /> width of the crest in an as-built <br /> narrow section was noted <br /> (southwest corner of the <br /> structure). <br />Appurtenant Structures <br />Defective Spillways No <br />Dewatering Device Clogged Not applicable (none installed) <br />Faulty Gates, Ba(tles, Pumps No <br />Other No <br />Additional Comments: None <br />' Maintenance Required: <br />Uncover burrows and re-compact in-situ backfill to dam construction specifications to maintain the <br />integrity of the dam. Reseed disturbed areas. This maintenance work should be accomplished before the <br />next high water season, but not during times the ground is frozen. <br />' Revegetation of the upstream, and some areas of the downstream, slopes is required to inhibit erosion <br />of the embankmen[ and burrowing activity. Reseeding is recommended a[ [he next optimum planing <br />season. <br />' Recommend: <br />Additional inspection at a time of high water is recommended. The areas of burrow activity need to be <br />' probed to determine if seepage is occurring (no seepage or signs of prior seepage were noted during this <br />inspection). <br />' Quarterly monitoring of erosion activity of unprotected embankment areas and the narrowing crest area <br />is recommended, and repairs accomplished should the integrity of the dam become threatened. <br />Erection of raptor perches to reduce rodent activity is recommended. After repairs to the embankments, <br />' quarterly monitoring of rodent activity is recommended. Should burrows continue to be a problem, <br />implementation of additional rodent control procedures to halt [he burrowing activity on the dam may <br />be required. <br />1 <br />1 <br />' Chimney Rock Mine Pond #002 Inspection Report, 21 October 1993. Page 2 of 3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.