Laserfiche WebLink
Block 1 contains live-handled roto-cleared topsoil (1992) that did not receive additional seeding <br />as a test block for the reintroduction of native plant species on live-handled roto-cleazed topsoil. <br />Repair of single gully on northern portion of Block (1994). <br />A portion of the northern section of Block received interseeding in 1995 as described in the <br />1995 Annual Reclamation Report. <br />Block 2 contains live-handled roto-cleared topsoil that was seeded in the spring of 1993. <br />• 1995 -Gully shaped and matted, Downdrain 3. <br />• 1998 -Downdrain 3 was reconstructed and riprapped. <br />• 2002 -Downdrain 3 was reconstructed and riprapped. <br />Block 3 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1996 -Lower slope area redisturbed to blend into Lower Moffat Road; gullies in redisturbed <br />area repaired and reseeded during the reshaping activity. <br />' Block 4 contains live-handled roto-cleared topsoil (1993) and was not seeded to further the trial <br />area started with Block 1. <br />• 1995 - At midpoint of Block, a portion was interseeded and livestock imprinted. <br />' • 1996 -Gully repair and seeding on lower slopes at midpoint of block where previous <br />livestock imprinting efforts where considered insufficient. <br />~' Block 5 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />• 1995 -Gullies repaired in conjunction with construction of Downdrain 1. <br />• 2001 -Gully repair and seeding south of Moffat Downdrain 2. <br />' Block 6 contains live-handled roto-cleared topsoil (1993) that was seeded in the spring of 1994. <br />' 1996 -Gully repaired and reseeded on lower slope. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />' • 2001 -Gully repair and seeding south of Moffat Downdrain 1. <br />• 2002 -Gully repair and seeding on north facing slope. <br />Block 7 contains live-handled roto-cleared topsoil (1994) that was not seeded as part of the test <br />practice employed in Blocks 1 and 4. <br />• 1995 -Gully repaired and reseeded on lower slope. <br />' Block 8 contains live-handled roto-cleared topsoil (1994) and was seeded in (1995). <br />• 1997 -Gully repaired and reseeded on lower slope south of Downdrain 4. <br />' Block 9 contains Live-handled roto-cleared topsoil (1994} and was seeded in 1995. <br />' • 1996 -Gullies along the lower slope repaired and reseeded. <br />• 1997 -Gullies caused by runoff from Lower Moffat Road narrowing activities repaired and <br />reseeded on upper slope. <br />1 <br />