My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20220
DRMS
>
Back File Migration
>
Report
>
REP20220
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:49 PM
Creation date
11/27/2007 2:50:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Report
Doc Date
1/23/2004
Doc Name
4th Quarter West Pit Fill Inspection Report & Certification
From
Knight Piesold and CO
To
DMG
Permit Index Doc Type
Waste Pile/Fill Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Knight Piesold <br />C O N S U L T I N G <br />January 20, 2004 <br />For: File <br />Re: Colowyo Coal Company L.P. (C-81-019) <br />West Pit Fill Inspection Report and Certification <br />Fourth Quarter, 2003 <br />Knight Piesold and Co. <br />1050 Seventeenth Street, Suite 450 <br />Denver, Colorado 80265-0450 <br />U.S.A. <br />Telephone (303) 629-8788 <br />Te[efax (303) 629-8789 <br />REFERENCE <br />West Pit Fill Construction Report <br />During the quarter beginning October 2003 and ending December 2003, aColowyo-employed <br />qualified specialist experienced in the construction of earth and rock fill embankments inspected <br />the area in which the West Pit Excess Spoil Fill is being constructed. I also completed an <br />inspection of the area on January 19, 2004. The purpose of these inspections was to inspect the <br />fill surface for vegetative efforts, inspect the fill for areas of water seepage or surface drainage, <br />and satisfy the requirements of CMDG Rule 4.09.1(1 la). <br />During the quarter, no progress was made on the West Pit Fill. No overburden was hauled to <br />backfill in the West Pit due to spoil room constraints. No sloping to final grade occurred. No <br />reclamation seeding was done during the quarter. No seepage was evident in the surface drain or <br />under drain during the quarter. <br />Attached to this report is my certification that all construction requirements have been met thus <br />far in constructing the West Pit Excess Fill. <br />aye T. Pickarts, P.E. <br />Senior Project Manager <br />xc: Mr. Crellin Scott, Colowyo Coal Company, L.P. <br />West Pit Fill Construction Engineering Report <br />cf 4.5.2 2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.