Laserfiche WebLink
1 <br />1 <br />SECTIONTWO <br />ScoMe of Work <br />In order to meet the objectives of the extraction well feasibility study, URS developed the <br />following scope of work: <br />Task 1 -Conduct Site Reconnaissance <br />Task 2 -Evaluate Existing Borehole Logs <br />Task 3 -Install Wells and Conduct Pump Test <br />Task 4 -Prepare Numerical Groundwater Model <br />Task 5 -Prepare Letter Report <br />V~7 ~isacxrt`i~~~enwnaiensxwsw_NOOexsow_wi~rrwns~.e_avaavno.i_o¢nv+ehsm ~ar.~ron~.mavaa anew 2-1 <br />