My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP20177
DRMS
>
Back File Migration
>
Report
>
REP20177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:47 PM
Creation date
11/27/2007 2:49:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
Report
Doc Date
11/24/1999
Doc Name
SPCC MCP UPDATE
From
CLIMAX MOLYBDENUM CO
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOKES BUiLDFNG ALARM PROCEDURE ~ I DATE ~ SUPEAS'eDES ~ APFRQVAL. :J PAGE <br />DOCLIMEPLT~:.. 30P 1'-2-19 . I DAT?: 2!70/95 1 OATE:1r20/92' INiT:_ 7 Of 1 <br />DfSTRtBUTiON: Mil! Superintendent DPerations Superiisors, MiII Control <br />NOKES BUILDING HZS HIGH ALARM PROCEDURE <br />NOKES BUILDING MANUAL ALARM PROCEDURE <br />1 . Sound emergency alarm ~ 15 seconds then turn off. <br />2. Announce aver Gaitronics: (Speak Slowly and Loudly) <br />ATTENTION ALL PERSONNEL <br />ATTENTION ALL PERSONNEL <br />THERE IS A NOKES BUILDING HZS HIGH ALARM <br />THERE IS A NOKES BUILDING HZS HIGH ALARM <br />3. Wait for MERT captain to size-up and access extent of problem and provide you <br />with ~.vhat action to take. <br />4. As response gets underway stay in regular communication with Mert captain, <br />passing on any further information that you receive to assist. <br />MILL BUILDING NOKES STORAGE TANK/NOKES TRELLIS H2S HIGH ALARM <br />1. Proceed immediately with a GENERAL EVACUATION <br />NOKES STORAGE TANK VENT LOW FLOW ALARM <br />1. MERT team call out or evacuation is not necessary <br />2. Notiry reagent supervisor <br />3. Demand update on status of situation before end of your shift. Log status in your <br />shift report. <br />4. Be especially aware of the potential of pokes storage tank H2S alarm when vent <br />fan low flow alarm has been activated. <br />NOKES BUILDING HZS MONITOR MALFUNCTION ALARM <br />1. MERT team tail out or evacuation is not necessary <br />2. Notify reagent supervisor <br />3. Notify an operations supervisor <br />4. Notify mill maintenance and the mill superintendent <br />• 3. Demand update on status of situation before end of your shift. Log status in your <br />shift report. <br />4. Employees should not enter the pokes building until the situation has been <br />assessed and cleared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.