Laserfiche WebLink
Hydrologic <br />• Pond FW-1 provides for water storage. <br />Water can also be stored in Sediment Ponds <br />MB-1, MB-2, and MB-3 under a separate <br />decree. Storage is usually limited to the <br />maximum sediment level elevation. Trans- <br />fer to FW-1 is possible as outlined in the M <br />& R Plan. Average withdrawals are not <br />expected to exceed 400,000 gallons per day <br />Morsiroring Ac[ivifiet <br />(gpd). Flow may fluctuate depending on <br />requirements associated with varying pro- <br />duction levels. During 1993, the average <br />withdrawal was 159,276 gpd for 250 work- <br />ing days. This increase in usage can be <br />attributed to more consistent operation of the <br />longwall and the resultant increase in pro- <br />duction. <br />Table 4 Summary of the Groundwater Monitoring Program at the West Elk Mine <br />Wall Water Level Field Water Quality Lab Water Quality <br />Facility Area Wells and Alluvial Wells <br />SG-l 3 times per year 3 times per year 3 times per ycar <br />GP-I 3 times per year 3 limes per year' 3 limes per year' <br />GP-3 3 times per year 3 times per year' 3 rimes per year' <br />GP-4 7 limes per year 3 times per year' 3 rimes per year' <br />GP-5 3 rimes per year 3 times per year' 3 times per year' <br />Facility Area Wcll completed in the Rollins Sandstone just below the "B" Seam <br />SOM-128-H 3 times per year 3 times per year 3 times per year <br />Permit Arca WeII completed in the 'E" Seam <br />• <br />SOM-23-H2 3 times per year' 3 times per year' 3 times per year' <br />Permit Area Wells completed in the Barren Member above the "F" Seam <br />B-32 3 times per year 3 rimes per year 3 times per year <br />SOM-80-H 3 times per year 3 rimes per year 3 times per year <br />SOM-13-H 3 limes per year 3 dmes per year 3 times per year <br />SOM-38-H-I Lost before the third season <br />measuremenrs <br />SOM-38-H-2 Lost prior to WY 1993 <br />SW-1 3 rimes per year 3 times per ycar 3 times per year <br />SW-2 3 times per year 3 timcs per year 3 tunes per year <br />SW-3 3 dmes per year 3 times per year 3 times per ycar <br />$W~ 3 times per year 3 times per year 3 times per year <br />SW-5 3 times per year 3 times per year 3 rimes per year <br />SW-6 3 times per year 3 times per ycar 3 times per year <br />Study Area Wells completed in the "F" Seam <br />SOM-2 3 dmes per year 3 times per year 3 times per year <br />SOM-l6-H 3 times per year 3 times per year 3 limes per year <br />SOM-38-H3 Lost prior to WY 1993 <br />Permit Area Wells completed m the "B" Seam <br />C-72-H 3 times per ycar 3 times per year 3 times per year <br />SOM-127-H 3 rimes per year 3 times per year 3 times per year <br />1MB-12' 3 times per year 3 times per year 3 limes per year <br />SOM-129-H 3 times per ycar 7 dmes per year 3 rimes per year <br />' Required plan, but partially or not accomplished due to no or insufficient water for sampling. <br />. 'Jumbo Mountain expansion addinon, measurcmena started with the third season measurements. <br />