Laserfiche WebLink
~~~~~ <br />~{ ~ <br />BATTLE MOUNTAIN RESOURCES, INC. <br />January 30, 2003 / <br />RECEIVED ~~~°et~~ <br />FEB 0 4 2003 ~ <br />Mr. Jim Dillie <br />Division of Minerals & Geology Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Battle Mountain Resources, Inc. DMG Permit No. M-88-112 <br />Monthly and Quarterly Sampling <br />Mr. Jim Dillie: <br />Enclosed are the analytical results from SVL Analytical Inc. and ACZ Laboratories Inc. <br />for the recent monthly and quarterly sampling periods as specified in the April 1992 <br />Abatement Plan. The cross-reference table between sample identification, sample types <br />and sample locations is also attached. <br />All required sampling was completed. Analyses that have been received are enclosed and <br />those that have not been received will be forwarded to you as soon as they are sent to me. <br />Sincerely: <br />~a ~ <br />ulio F. Madrid <br />Enclosures <br />cc: Bill Lyle <br />File <br />P.O. Box 310 • San Luis, Colorado 8 1 1 5 2-03 10 (719) 379-0798 Fax (719) 379-0713 <br />