My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-10-16_REPORT - M1977184
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977184
>
1990-10-16_REPORT - M1977184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 6:06:36 PM
Creation date
11/27/2007 2:48:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977184
IBM Index Class Name
Report
Doc Date
10/16/1990
Doc Name
ANNUAL REPORT FN M-77-184 FT COLLINS PIT
From
WESTERN MOBILE
To
MLRB
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V,�GG Western • III III III IIIIIII III • West m M Taft obtle Hill Rd <br /> 7Mc Mobile 9 Box <br /> 2187 <br /> Fort Collins,s, <br /> Colorado 80522 <br /> 303-482-785A <br /> 5344W Metro <br /> Fax 303-224-5W <br /> October 16 . 1990 <br /> Fa „ E p <br /> Mined Land Reclamation Board <br /> 1313 Sherman Street. , Room 215 <br /> Denver, Co 80203 <br /> RE: Annual Report, MLRB File No. M-77-184 t0mc'' Land <br /> Fort Collins Pit Reclamation Division <br /> Anniversary Date: 10/30/90 <br /> Dear Board Members: <br /> In compliance to the Rules and Regulations of the Board, <br /> please find enclosed a check #75300 in the amount of $350, <br /> full payment of the annual fee. Also, as required, the <br /> following information is provided for the annual report. <br /> 1 ) Much of the site has been affected in the course of <br /> reclamation and maintenance during this reporting <br /> period. <br /> 2 ) Approximately one acre east of the batch plant and <br /> one half of an acre in the southwest corner of the <br /> site was backfilled for future development. <br /> 3 ) The existing lakes are all in the process of being <br /> backfilled to the correct size. After that, sloping, <br /> topsoiling and seeding will be done. <br /> 4 ) No seeding was done this year. <br /> 5 ) No fertilizers or soil conditioners were applied <br /> this year. <br /> 6 ) See above <br /> 7 ) Much of the site will again be affected this year in <br /> a continuing effort to finalize reclamation. <br /> 8 ) The effective date of this report is 10/16/90. <br />
The URL can be used to link to this page
Your browser does not support the video tag.