Laserfiche WebLink
<br /> <br />STEFFEN ROBERTSON AND KIRSTEN INC. <br />Consulting Engineers & Scientists DAILY SUMMARY dF FIELD MdIS UREJDENSI'I'~' TESTS <br />JOB NO.: 74722 DATE; 8-20-93 <br />SUBIECT: BMG TAILINGS DISPdSAL AREA ADDI'CION <br />Nth SLOPE AT PROPANE 7'NK MATE.RIf-L: TYPE 4 <br />TES TE5T ELEV. FIELD TEST LAB. TEST TYP OF PA5S Cc~MP CC)MP. <br />NO. LOCATION FT. <br /> <br />FILL WET <br />DENSITY <br />PCF DRY <br />DENSITY <br />PCF MOIST. <br />% MA.~CIMUM <br />DRY <br />DENS. PCF d. M.C. <br />% TI3ST <br />*N CSR S dR <br /> <br />FAIL S:PEC. <br />% FIELD <br />% <br />_ <br />92 150' Sth 1 FOO 118.4 110.1 7.5 112.1 14.7 N P 95 98.3%' <br />_ OF TANK ~ <br /> <br />93 <br />30' Est <br />1 FOd <br />1 ] 8.2 <br />110.6 <br />6.9 <br />112.1 <br />14.7 <br />N <br />P <br />95 _ <br />98.6oJa <br /> OF TANK ~ <br /> <br />94 <br />10' Nth <br />2 FEE <br />117.4 <br />110.7 <br />6.1 <br />112.1 <br />14.7 <br />N <br />P <br />95 _ <br />_ <br />98.'7%_ <br /> OF TANK _ <br />97 60' Nth ci 3 FEE 117.1 108.8 7.6 172.1 14.7 N P 95 9`T.1% <br /> LINED DITCH _ _ <br /> <br />0.0 <br />95 _ <br />ERR <br /> <br /> 0.0 95 ERR <br /> <br /> 95 ERR <br /> <br /> 0.0 95 ERR. <br /> <br />* N = NUCLEAR, S =SAND CONE SRK DENSUM4A.WQ1 <br />