Laserfiche WebLink
it <br />5) Map 28 Topsoil Handling <br />Response <br />As requested the map has been modif:ied to include the two <br />topsoil stockpiles. Three copies of the meip are included <br />herein for the Division's records. <br />6) Topsoil Handling <br />Response <br />The appropriate narrative has been modified to address the <br />Division's concerns. Revised pages are attached. <br />7) Blasting Records <br />Response <br />The Division's concerns are noted and the appropriate <br />modifications to the blasting records have been made. Also <br />attached is modified page 2.05-34. <br />8) Excess Spoil Fills <br />Response <br />Colowyo's response will follow under separate cover. <br />9) Stock Ponds <br />Response <br />Per page 4.05-8 Colowyo intends to eventually construct small <br />stock watering ponds onto reclaimed areas. At this time we <br />have no specific plans for these ponds. Prior to construction <br />of the ponds, all appropriate designs, maps etc. will be <br />submitted to the Division for approval. <br />10) Shrub Selection <br />Response <br />Colowyo agrees that shrub selection should be based on <br />adaptability and success of transplanted spec:Ces. The phrase <br />"Depending on availability and price" merely reflects the <br />reality that first, availability of shrubs in i.he market place <br />determines the resulting price and secondly, the price affects <br />the selection process such as bare-root stock versus <br />containerized or potted stock. <br />5 <br />