Laserfiche WebLink
ORCHARD VALLEY MINE <br />QUARTERLY WASTE DISPOSAL AREA INSPECTIONREPORT <br />WEST RIDGE WASTE PILE <br />Item Y/N Comments <br />12. Topsoil adequately savaged and stored? Y No additional topsoil was salvaged from the pile this <br />quarter. Topsoil and subsoil was replaced as required <br />to maintain berm around perimeter of pile. <br />13. Trash removed? Y <br />14. Additional comments? N <br />During the 2nd quarter, 1994, construction of the West Ridge Waste Pile wntinued with gob generated from reject <br />material at the Fast Mine Crushing & Screening facility and from the Orchard Valley West Mine. Remaining <br />material from the clean out of the West Mine sediment pond was relocated to the gob pile. Drainage control was <br />monitored and maintained throughout the quarter. <br />I certify the above report as being accurate to the best of my belief and knowledge. <br />~~ <br />t~~ti <br />` Signature <br />~/,~S/9 ~ <br />Date <br />