Laserfiche WebLink
<br />Bowie Resources, LLC <br />Bowie No. 2 Mine <br />2005 Annual Hydrology Report <br />DH-65 <br />Dove Gulch -Monitoring Well <br />Pipe Elevation - 7845 <br />Pipe 1.15' above ground <br />Depth -1020.8' <br />Ground Water <br />Initiated 10/12/2000 10/12/2000 10/12/2000 10/12/2000 <br />Activated <br />Date 12/21/2005 9/9/2005 6/26/2005 3/10/2005 <br /> <br /> <br />Summary Information <br />Baseline <br />INITS Min Ave Max <br />Operation <br />Min Ave Max <br />Static Water Level Feet 1020.8 1020.6 1020.6 <br />Water Elevation Feet 6824.4 8824.4 8824.4 <br />FieldComment D D Dry D <br />ph su <br />Conductivity umhos/cm <br />Temperature Celsius <br />The monitoring point location for DH-fi5 is located along an AN trail, near the mouth of Dove Gulch. This hole is <br />completed above the D seam. <br />Baseline Information Collection initiatetl on 10/12/00 and not yet wnsideretl complete. <br />Point DHbS has not been influencetl by mining. <br />Figure No. 140 <br />The area of croncem for monitoring point DH-65 has not been affectetl by Me mining operation. Therefore, all recorded <br />monitoring events are considered Baseline. <br />