Laserfiche WebLink
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />2005 Annual Hydrology Report C-2 <br />North Fork -Drainage System <br />Elevation - 5930 <br />Initiated 6/29/2000 8/29/2000 6!29/2000 6/29/2000 <br />Activatetl <br />Date 10/13/2005 8/2/2005 8/29/2005 5/24/2005 <br />Summary In(orma6on <br /> <br />• <br /> <br /> <br />i <br />3 t <br /> <br />3v.~. - baseline Operation <br /> <br />UNITS Min Ave Max Min Ave Max <br />Flow GPM 0 0 0 0 0 0 0 0 0 0 <br />FieldComment Dry Dry Dry Dry <br />h su <br />Conductivity umhos/cm <br />Temperature Celsius <br />~*.~ <br />~1 ~~ a' <br />UNITS <br />Bicarbonate m /L <br />Chloride mg/L <br />Conductivity umhos/cm <br />Hardness mg/L <br />Nitrate-Nitrite mg/L <br />Oil antl Grease m /L <br />H su <br />Phosphate m /L <br />ResidueFilterable (TDS) mg/L <br />ResitlueNonFilterable (TSS) mg/L <br />SAR <br />Sulfate m /L <br />Aluminum mg/L <br />Arsenic mg/L <br />Cadmium mg/L <br />Calcium m /L <br />Cop er m /L <br />lron (rota!) mg/L <br />Lead mg/L <br />Magnesium mg/L <br />Man anese otap m /L <br />Merv m /L <br />Molyebdenum mg/L <br />Selenium m /L <br />Sodium mglL <br />Zinc mg/L <br />The area of concern for monitoring point C-2 has not been affected by the mining operation. There/ore, all recorded <br />monitoring events are considered Baseline. <br />The C-2 monitoring point is a culvert under the Union Paafic Railroad. It is located 2440 feet northeast of the C-1 culvert. <br />Baseline Information Collection initiated on 6/29/00 and not yet considered wmplete. <br />Point C-2 has rim been influenced by mining. <br />Figure No. 85 <br />