My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP19655
DRMS
>
Back File Migration
>
Report
>
REP19655
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:19 PM
Creation date
11/27/2007 2:41:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
5/8/2006
Doc Name
2005 Annual Hydrology Report Part 2
From
J.E. Stover & Associates Inc
To
DMG
Annual Report Year
2005
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources, LLC Surface Water <br />Bowie No. 2 Mine <br />• 2005 Annual Hydrology Report TC-up <br />Terror Creek -Drainage System <br />Elevation - 7080 <br />Inifialetl 9/30/1998 9/30/7996 9/30/1996 9/30/1996 <br />Activated _ <br />Dale 1228/2005 9/19!2005 6/22/2005 4/18/2005 <br />Summary Information <br />s x~~f1r 7; Baseline Operation <br />`. °i} ~+~~:~` UNI7S Min Ave Max Min Ave Max <br />Flaw CFS 0.0 5.7 44.1 0.2 4.4 34.9 40.4 <br />Water Level in Flume Feet 0.00 0.40 1.90 0.08 0.44 1.64 1.8 <br />FieldComment <br />ph su 7.2 8.1 8.6 8.2 8.2 8.1 7.9 <br />Conduc6vi umhos/cm 40 98 180 130 70 90 40 <br />Temperature Celsius 0.2 8.1 19.2 0.4 14.9 11.3 3.2 <br />DO mg/L 0.0 5.2 10.8 10.8 9.9 8.8 9.6 <br />lI 1, <br />u <br />The monitohng point locahon for Upper Terror Creek is located on Terror Creek just above the confluence of Terror Creek and West Terror <br />Craek. /7 is accessed by the Terror Creek mad by pemrission through locked gates. This point is referretl to in the Bowie No. 1 Annual <br />Hydrology Report as SW02. <br /> <br />Baseline Information Collection initiated on 9/30/96 and not yet wnsitlered complete. <br />Point TC-up has not been inFluenced by mining. <br />Figure No. 128 <br />The area o/concern for monitohng point TC-up has not been affected by the mining operation. Therefore, all recoMed <br />monitohng events are considered Baseline. <br />
The URL can be used to link to this page
Your browser does not support the video tag.