Laserfiche WebLink
i <br />Third Party Oversight 4 Water, Waste & Land, Inc. <br />' San Luis Mina ~ Juno 9, 1994 <br />' 2.0 REVIEW OF DESIGN AND GEOTECHNICAL ISSUES <br />' Pertinent documents concerning the design and construction of the existing facility and <br />the planned expansion to the tailings impoundment system were reviewed prior to WWL's <br />initial site visit. The focus of the review was on the key geotechnical issues associated with <br />the Raise I Expansion, and how the expansion related to the intent of the original Phase I and <br />' Phase II designs. <br />' 2.1 INITIAL DESIGN REVIEW <br />WWL's evaluation of the design for the expansion reflected our review and <br />' understanding of documents concerning design, construction, and monitoring of the original <br />(Phase I) embankment and the Phase II, Raise I Embankment; previous site expNoration work <br />and testing; site and construction material conditions; and, tailings disposal procedures at the <br />' time of our initial site visit. Information sources utilized in our initial evaluation are listed <br />below. <br />' ^ Technical documents reviewed prior to the initial site visit included: <br />~ 112 Permit Application for the San Luis Project, (BMRI, 1989). <br />' n 112 Permit Application Amendment for the San Luis Project, (SRK, <br />1989). <br />~ San Luis Project Permit Amendment Adequacy Responses, M-88-1 1 2, <br />' ISRK, 1990). <br />~ San Luis Project Tailings Impoundment Construction Report, (SRK, <br />1991). <br />' ~ San Luis Mine Phase II, Raise I Design Report, ISRK, 1993a-. <br />~ Construction Status Report, San Luis Project Tailings Disposal Area, <br />Phase II, Raise I, (SRK, 1993c). <br />' ^ The initial site visit and meeting with DMG and BMRI staff on October 28, 1993 <br />and additional meetings and conversations with DMG staff. <br />^ Geotechnical monitoring data collected prior to and after initiation of construction <br />of the original (Phase I) embankment. <br />' ^ Various correspondence, submittals, and revisions pertinent to the design and <br />intent of the expansion reviewed prior to the site visit. <br />^ Review of laboratory and QA/OC test results conducted after initiation of <br />expansion construction and prior to initiation of the third-party oversight work. <br />' 2.2 DESIGN INTENT <br />' Based on WWL's review of the documents listed above, our understamding of the <br />design intent of the tailings disposal facility pertinent to Raise I Expansion is summarized in <br />the following paragraphs. <br />1 <br />1 <br />