Laserfiche WebLink
<br /> <br /> <br /> <br />Third Perty Oversight 25 Water, Westa & Lend, Inc. <br />San Luis Mine June 9, 1994 <br />Division of Minerals and Geology IDMG), 1993k. Letter to Ken A. Kluksdahl, BMRI, "Division <br />Review Comments, BMRI -October 1, 1993, Construction Status Report, San Luis <br />Project Tailings Area, Phase II, Raise I, File No. M-88-112," from Larry D. Oehler, <br />November 2. <br />Division of Minerals and Geology (DMG1, 19931. Letter to Ken A. Kluksdahl, BMRI, <br />"Placement of Phase II Tailings, San Luis Project, File No. M-88-1 12," from Larry D. <br />Oehler, November 4. <br />Division of Minerals and Geology (DMG), 1993m. Letter to Alana L. Scott, BMRn "Adequacy <br />' Review of Technical Revision TR-016, San Luis Project, File No. M-88-1 12," from Allen <br />C. Sorenson, December 23. <br />' Steffen Robertson and Kirsten (U.S.I, Inc. (SRKI, 1989. "1 12 Permit Application Amendment, <br />San Luis Project, Costilla County, Colorado," prepared for BMRI, September. <br />' Steffen Robertson and Kirsten IU.S.1, Inc. (SRK), 1990. "San Luis Project Permit Amendment <br />Adequacy Responses, M-88-112," prepared for BMRI, January 9. <br />' Steffen Robertson and Kirsten IU.S.1, Inc. (SRK), 1991. "San Luis Project Tailings <br />Impoundment Construction Report," prepared for BMRI, July. <br />Steffen Robertson and Kirsten (U.S.1, Inc. (SRK), 1993a. "San Luis Mine Phase II, Raise I <br />Design Report," prepared for BMRI, July 13. <br />1 Steffen Robertson and Kirsten (U.S.1 Inc. (SRKI, 1993b. Letter to Alana Scott, BMRI, "San <br />Luis Project Phase II Raise I Design Report," from David Hallman, July 28. Attached <br />to BMRI, 1993c. <br />' Steffen Robertson and Kirsten (U.S.), Inc. (SRKI, 1993c. "Construction Status (Report, San <br />Luis Project Tailings Disposal Area, Phase II, Raise I," prepared for BMRI, October 13. <br />' Steffen Robertson and Kirsten (U.S.1, Inc. (SRKI, 1993d. "Drainage BlanketlLinerCover Layer <br />Permeability," prepared for BMRI, October 27. <br />Steffen Robertson and Kirsten (U.S.1, Inc. (SRK), 1993e. "Cold Weather Construction <br />Activities," prepared for BMRI, November 2. <br />' Steffen Robertson and Kirsten (U.S.1, Inc. (SRKI, 1994. "San Luis Project Tailings Disposal <br />Area, Phase II, Raise I, Final Construction Report," prepared far BMRI, Maly 16, 1994. <br />1 <br /> <br /> <br />1 <br />1 <br />