Third Party Oversight 13 Water, Waste & land, Inc. <br />' Sen Luis Mine June 9, 1994 <br />As shown in the tables above, the major change to the Type 1 material ecifications <br />was to allow for a significant increase in the percent passing the #40 and~#200 (fines) <br />screens. With increasing fines content, permeability of the embankment could potentially be <br />' lower than that which was intended in the original design and lower than that df the original <br />(Phase I) embankment. A lower permeability within the embankment could result in a <br />decrease in the rate of tailings fluid drainage into the embankment, and a corresponding <br />increase in the phreatic surface within the tailings. <br />' In addition to the change to the gradation specification, a larger maximum particle size <br />was defined in the revised specifications. The potential for piping of tailings into and through <br />the embankment existed if significant quantities of oversized materials were placed in the <br />embankment concurrently with tow compactive effort. <br />4.2 INITIAL CONSTRUCTION <br />' During the initial site visit by WWL and DMG on October 28, 1993, significant <br />quantities of material larger than the revised specification for maximum size 16 ilrlchesl were <br />observed on the tap surface and upstream face of the embankment. Materials up to 30 <br />inches in diameter were located along the upstream face of the embankment. It was not <br />possible to determine the actual quantity (percentage) of oversized materials being placed as <br />embankment fill was not being hauled and placed during the inspection. <br />1 <br />4.3 TECHNICAL ISSUES <br />The key technical issues associated with Raise I Embankment materialls are shear <br />strength (for acceptable static and seismic stability), permeability Ifor drainage of tailings <br />fluidsl, and filter compatibility (for protection against piping of tailings into the enbankment). <br />The well-graded material proposed for the Raise I Embankment in the original slpecifications <br />(SRK, 1993c) would provide acceptable shear strength and protection against piping, if <br />' properly compacted. <br />The remaining issues concerning embankment material are permeability ahd drainage. <br />' Although materials used for the embankment were not within the specifications stated in the <br />original design report (SRK, 1993a1, acceptable drainage can be verified by the installation and <br />monitoring of piezometers as shown in Figure 1. Five piezometers installed at the crest of the <br />embankment and screened at or near the base of the fill, and five piezometers installed at the <br />' toe of the upstream face of the embankment would allow the phreatic surface within the <br />embankment and within the tailings near the embankment to be monitored (if present). Water <br />levels within the piezometers should be monitored on a quarterly basis. <br />1 <br />4.4 FINAL CONSTRUCTION <br />' Although some oversized materials were incorporated into the embankment, equipment <br />operators provided good compactive effort and attempted during material placement to either <br />' break down or move the oversized materials to the upstream and downstream embankment <br />faces. <br /> <br /> <br />