Laserfiche WebLink
<br /> <br />ANNUAL RECLAMATION REPORT <br />MESA GRAVEL PIT <br />PEABODY COAL COMPANY <br />PERMIT NO. 82-36 <br />INTRODUCTION <br />. .. ;-~-...~ n.'. <br />u~w. ~,~ . aJ u ~_. <br />,I;Jr~ ~ , ,.. <br />P'InED LAidD RLCLt;":P,r~O~ ~""` ~' <br />rnip, Hoot. et i~'ir:.d iesc~• .~- <br />Expansion of the mining operation (from the initial permit approval) has allowed an <br />increasing amount of reclamation activities to take place. As shown on Exhibit 2.41 <br />(revised), and by this report, advances since last reporting have been made in backfilling, <br />grading, topsoiling and revegetation. <br />Gravel production from this pit has and will continue to be used as surfacing material for <br />coal haulage roads at the Seneca II Coal Mine. <br />The reporting period for this annual reclamation report is from June I, 1983 to June I, <br />1984. <br />I. Location and number of acres affected during that year. <br />RFCP(1nICF. <br />Activit Acres <br />Topsoil removed ahead of active pit 0.5 <br />Active Pit Advance 3.1 <br />2. Locations and number of acres reclaimed that year. <br />RESPONSE: <br />There were 0.9 acres totally reclaimed this year (June, 1983 through June, 1984). <br />