Laserfiche WebLink
<br />JVED <br />.. ~~a <br />I 1'~ V <br />December 14, 1998 s&Geo~gy <br />Mr. Jim Dillie <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />iii iiiiiiiiuiiiiii <br />Subject: Battle Mountain Resources, Inc. -San Luis Project <br />DMG Permit No. M-88-112 <br />Monthly Response Status Report -November 1998 <br />Dear Mr. Dillie: <br />The following areas are port of our Response Plan and their status during the month of <br />November was as follows: <br />INTERIM MEASURES <br />The french drain and sump pump was in service all month collecting water and <br />returning it to the infiltration trench in the West Mine. The water was contained in <br />the trench all month. The ADS pipe is installed in the trench and the trench is covered. <br />BMRI submitted a revised Response Plan to the Division on November 16, 1998. <br />FIELD CHARACTERIZATION & HYDROLOGICAL EVALUATIONS <br />Mitchell Drilling Company is on site and preparing to begin drilling the pre-Cambrian <br />and alluvial wells . As the wells are completed pump tests and sampling will begin. <br />Layne Inc. is scheduled to begin drilling wells in the backfilied area the first week of <br />January. <br />Sincerely, <br />Ron Zu alt <br />Enclosures <br />cc: Bill Lyle <br />Dan Robertson <br />File <br />