My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP19424
DRMS
>
Back File Migration
>
Report
>
REP19424
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:08 PM
Creation date
11/27/2007 2:38:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Report
Doc Date
3/1/2007
Doc Name
Annual Biosolids Permit Rpt
From
Climax Molybdenum Company
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
't: <br /> <br />LAND APPLIER <br />CERTIFICATION STATEMENT <br />PARKER AG SERVICES, LLC <br />For <br />Generator: Parker Af;/Climax Mine Composting Site <br />"I certify, under penalty of law, that the biosolids stability requirements in sections <br />^ 64.12 (C)(11} $iosolids shall be subsurface injected, and <br />(a) No significant amount of the biosolids shall be present on the land surface <br />within one hour after the biosolids are injected. <br />(b) When the biosolids which are subsurface injected are considered to be <br />Class A with respect to pathogens, the biosolids shall be injected within <br />eight hours after being discharged from the pathogen treatment process. <br />^ 64.12 (C)(12) Biosolids which aze surface applied shall be incorporated into the soil within <br />six hours after application to or placement on the land. <br />^ 64.12 (C)(13) When biosolids that are incorporated into the soil are considered to be Class A <br />with respect to pathogens, the biosolids shall be applied to or placed on the <br />land within eight hours after being dischazged from the pathogen treatment <br />process. <br />and, as necessary, the appropriate management practices in sections <br />x 64.13, 64.15 and 64.16 <br />have been met. This determination has been made under my direction and supervision in <br />accordance with the system designed to ensure that qualified personnel properly gather and <br />evaluate the information used to determine that the pathogen requirements have been met. I am <br />aware that there are significant penahies for false certification including the possibility of fine and <br />imprisonment " <br />DATE: <br />BY: ' <br />PRINTED: MIKE SCHARP <br />TITLE: DIRECTOR OF PROGRAM DEVELOPMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.