My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REP19377
DRMS
>
Back File Migration
>
Report
>
REP19377
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:48:06 PM
Creation date
11/27/2007 2:38:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Report
Doc Date
8/6/1991
Doc Name
JULY MONTHLY OPERATING REPORT
From
JC LENZ
To
GC DODSON
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l • III III III III IIII III • <br />August 6, 1991 <br />To: G.C. Dodson <br />From: J.C. Lenz <br />Subject: July Monthly Operating Report <br />1. Mill Operations <br />1.1 Crushing <br />Approximately 101,805 wet tons of ore were crushed <br />in July. Operating availability of the primary <br />crusher was 83.3$. Operations were routine during <br />the month. <br />For the last three months, a comparison of the wet <br />tons totalized by CV-02 versus the throughput of the <br />primary crusher as estimated by loader bucket count <br />revealed a difference of only 1.78$. This <br />correlation indicates that the proper tonnage factor <br />has been used when calculating throughput based on <br />the number of loads fed to the crusher. <br />1.2 Grinding <br />100,429 dry tons of ore were ground during July. <br />Operating availability of the plant decreased to 80.66$ <br />this month. Average plant throughput for the month <br />decreased to 167 tons per hour. Major downtime was caused <br />by replacement of the SAG mill feed chute, failure of <br />the SAG mill Tube oil pump, and slurry handling problems <br />associated with bypassing the ball mill. <br />The thickener underflow piping modification was completed <br />on July 12th. Thickener dilution piping was underway at <br />month's end. Completion is expected in August. <br />
The URL can be used to link to this page
Your browser does not support the video tag.