My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-05-28_REPORT - M1977315
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977315
>
1985-05-28_REPORT - M1977315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2023 5:58:08 PM
Creation date
11/27/2007 2:37:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977315
IBM Index Class Name
Report
Doc Date
5/28/1985
Doc Name
BESTWAY PAVING CO ANNUAL REPORT PN 77-315
From
BESTWAY PAVING CO
To
MLRD
Permit Index Doc Type
ANNUAL FEE / REPORT
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • 131 <br /> POST 999 <br /> III III III IIIIIII III <br /> __ BEST - WAY PAVING CO. GREELEY, DO <br /> ZIP CODE 80633 <br /> 0633 <br /> GREELEY 353-1654 <br /> DENVER 623-9438 <br /> May 28, 1985 <br /> Department of Natural Resources <br /> Mined Land Reclamation Division -..w•„,.&INICeS <br /> 423 Centennial Building <br /> 1313 Sherman Street <br /> Denver, CO 80203 <br /> Re: Best-Nay Paving Co. Annual Report; Permit No. 77-315 <br /> Gentlemen: <br /> Best-Way Paving Co, submits the following information concerning its mining <br /> and reclamation activities for the year 1984: <br /> 1. The Company completed extraction of gravel in Phases 2 and 3 of the <br /> mining plan and approximately 25% of Phases 4 and 5, affecting approx- <br /> imately 6.5 acres. Phase 1 is approximately three-fourths extracted and <br /> bac}:filled. <br /> 2. Phases 2 and 3 are backfilled, however topsoil needs to be added and the <br /> areas brought to grade in accordance with the mining plan, which should be <br /> completed this season. <br /> 3. No internal reclamation beyond the backfilling, topsoil and grade work has <br /> been completed, therefore there has been no planting of any vegetation. <br /> This will probably begin in the spring or summer of 1986. <br /> 4. Although it is not possible to determine at this point, it is anticipated <br /> that Phases 4 and 5 will be extracted, or nearly extracted, by the end of <br /> the 1985 season. <br /> If any additional information is required, please let us know. <br /> Very truly yours, <br /> 66�xj�' V/, Jr. <br /> President <br /> TAC/cnd <br />
The URL can be used to link to this page
Your browser does not support the video tag.