Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />1997 Rill and Gully Monitoring <br />Seneca II-W Mine <br />During April and May, Seneca reclamation personnel conducted the annual rill and <br />gully survey at the Seneca II-W mine. Following is a list of projects and actions for <br />June, July and August 1997: <br />• Rill by stockpile EE in 1995 reclaimed area---disc and reseed <br />• Rill by stockpile L in 1994 reclaimed area---disc and reseed <br />• Rill by stockpile GG in 1996 reclaimed area--disc and reseed <br />• Slide by stockpile L--regrade and reseed <br />• Slide at pond 006--rebuild road with underdrain <br />• Small slide on A road cut bank by 006--regrade and reseed <br />• Erosion at top end of Groad--reestablish road ditch <br />• Erosion east of old powder house location--reestablish channel and road <br />drainage <br />• Slide by stockpile CC on haul road A cut bank--regrade and reseed <br />• Slide on ME road fill slope below 006 pond-- regrade and reseed <br />