Laserfiche WebLink
• ooley Gravel Compan}• <br />1977 Littleton Reclamation Schedule <br />February 1 - April 1 Planning and Budgeting <br />April 4-8 Grade steep north d: northwest pond banks <br />April 22-30 Spread manure for soil im;~rovement <br />;lpril 23 Plant State seed .lings <br />~1ay 9 Plot irrigation ditches <br />Atay 16 Disc to fallow manure <br />June 7 Second discing to prepare seedbed <br />June 20-24 Complete survey of property lines; mark west <br />June 24 Arrange ditch plotting on west with SCS <br />June 27-30 Pull ditches for irrigation and trceplanting <br />July 1 Doze strip on south <br />July 1 Plant 500 2-2 transplant oaks, pines <br />July 2 Begin irrigation program <br />July 2 Dise southern boundary strip <br />July 5 Disc around new transplants <br />July 30 Charlie MacLean wheat harvest <br />August 1 Disc western boundary strip <br />A:gust 5 Plot ditch <br />August 8 Pull ditch ' <br />August 10 Plant 1~-"trees south end (15) i <br />August 15 Plant 1'~" trees west side (20~ <br />.\ugust 17 Disc north and northwest Hood banks to prepare <br />f r. eding <br />,.ugust 19 Seed grass cover, using grain ~rislg <br />September 15 ( Spray weeds <br />October 15 Terminate 1977 irrigation program <br />