Laserfiche WebLink
<br />ANNUAL REPORT <br />INSTRUCTIONS <br />According to C.R.S. 34-3:?-116(3), and C.R.S. 34-32.5-116(3)(a), on the anniversary date of the perntit each yeaz, <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land. <br />reclamatioin accomplished to date and during the preceding yeaz, new disturbances that aze anticipated to occur <br />during the upcoming year, and reclamation that will be performed during the upcoming year. Please attach such <br />a report and map to enclosed annual report form. (An adequately labeled map that clearly delineates attd includes <br />the above elements may suffice for a written report. j <br />ff your op ration is subject to the provisions of Temporary Cessation as defined in the Act and Rules, you must <br />provide with the Annual Report the follvu~ing information as required by 2 CCR 407-1.407-4, and Rules <br />] :13.7{ 1)(~a): <br />(I) the condition of the operation at the time of cessation; <br />(iij what specinc measures have been and wiil'oe implemented to comply with reclamation, <br />performance standards and Environmental Protection Plan requirements, if they are pan of your <br />approved application: and <br />I <br />(iii) plans for resumption of mining operations. <br />Please provide the additional following infotmation with your Annual Report, as applicable: <br />O Per the requirements of 2 CCR 407-1.407-4, and Rules 1.15(1), provide an updated statement <br />regarding [he sufficiency of [he value of [he Financial Warranty, specifically: <br />(I) Per the requirements' of 2 CCR 407-1, 407-4, and Rules 1.15(I)(a), provide an updated <br />statement re~ardin~ the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit. Deeds of Trust, and security agreements, self-insurance, salvage <br />credit, and first priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules L15(11(b), permits secured with a <br />Deed of Ttust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property value, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security Agreement, <br />and [he':alue of the property subject to either of these instruments. <br />The report shall also provide proof that there are no past-due property taxes. <br />(iii) Per the requirements of 2 CCR 407-I, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />i of a balance sheet, certified by a Certified Public Accountant, demonstrating that the <br />Letter of Credit does not exceed ten percent (10°io) of the bank's capital surplus accounts. <br />(vi) Per the requirements of 2 CCR 407-].407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficient <br />detail to fully describe the condition, value, and location of all pledged fixtures <br />and equipment. <br />(b) Per the reyuirements of 2 CCR 407-].407-4. and Rules 1.15(1)(c), all monitoring information <br />required as pan of the approved permit application, to include the Environmental Protection Plan, <br />{Please note that if you are not a Designated Mining Operation, you will not have an Environmental <br />Protection Plan as part of your approved permit.] <br />