Laserfiche WebLink
ANNUAL REPORT. <br />INSTRUCTIONS <br />According to C.R.S. 34-33-I 16(3), and C.R.S. 34-32.5-I 16(3)(a), on the anniversary date of the permit each vear. <br />the operator shall submit a report and a map showing the extent of current disturbances to affected land. <br />reclamation accomplished to date and during the preceding year, new distunances that are anticipated to occur <br />during the upcoming year, and reclamation [hat will be performed during thy: upcoming year. Please attach such <br />a report and map to enclosed annual repon form. (An adequately labeled map that clearly delineates and includes <br />the above elements may;uffice~far~ewritten report.) <br />r . <br />If your operation is subject to she provisions of Temporary Czssation as dzfined in the Act and Rules, you mus[ <br />provide with the Annual Report the following information as required by 2 CCR 407-1, 407-4, and Ruhs <br />1.13.7(i)(a): <br />(i) the condition of the operation at the time of cessation; <br />(ii) what specific measures have been and will be implemented to comply with reclamation, performance <br />standards and Environmental Protection Plan requirements, if [hey are part ~~f your approved application; and <br />(iii) plans for resumption of mining operations. <br />Please provide the addi[ional following information with your Annual Repert, as applicable: <br />(a) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1), provide an updated statement <br />regarding the sufficiency of the value of the Financial Warranty, specifically: <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.1>(I)(a), provide an updated <br />staterrfen[ regarding the sufficiency of the value of the financial warranty. Specifically, <br />irrevocable letters of credit, Deeds of Trust, and security a~Teements, self-insurance, salvage <br />credit, and firs[ priority liens on project related fixtures. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 1.15(1)(b), permits secured with a <br />Deed of Trust or a Security Agreement, the operator shall submit an update, by a qualified <br />independent appraiser, indicating any changes in property ~ialue, and a statement summarizing <br />any circumstances which may affect the adequacy of the Deed of Trust, or Security agreemen[, <br />and the value of the property subject to either of these instruments. The repon shall also provide <br />_ __ _ _ _-____ - _ proof that there are no_past-due property taxes. -- - - - - - - - _ - <br />(i) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.7(3), permits secured with an <br />Irrevocable Letter of Credit, the operator shall have the bank provide documentation in the form <br />of a balance sheet, certified by a Certified Public Accountant, demonstrating tha[ [he Le[[er of <br />Credit does not exceed ten percent (10%) of the bank's capital surplus accounts. <br />(ii) Per the requirements of 2 CCR 407-1, 407-4, and Rules 4.9.3(c), permits secured by a First <br />Priority Lien on any fixtures and Equipment, the operator shall provide a report in sufficien[ <br />detail to fully describe the condition, value, and location of all pledged fixtures and egcipment. <br />(b) Per the requirements of 2 CCR 407-1.407-4, and Rules 1.15(I)(c), all monitoring infot~rration <br />required as part of the approved permit application, to include the Environmental Protection Pl:tn. (Please <br />note that if you are not a Designa[ed Mining Operation, you will ncrt have an Environmental Protection <br />Plan as pan of your approved permit.) <br />