Laserfiche WebLink
<br />L <br />October 31, 1995 <br />Page 2 012 <br />• <br />D ` Lower Tailinsas Site <br />1. Small borrow site area for topsoil material placed in Permit Area A was regraded, <br />shaped, fertilized and seeded. Area is next to road on E side and comprised <br />approx. 1l2 acre. <br />2. Diversion ditch on E side of tailings site was reconfigured to address erosion <br />problems with water entering facility breach area. Modification to the ditch <br />alignment was reviewed during 9129195 inspection with S. Shuey and corrections <br />are being undertaken in late October and November, 1995. Completed work will <br />be reported in 1996 annual report. <br />E Nothin to re ort. <br />F Nothing to report. <br />Thank you for your time and attention on this matter. If you or any members of your staff have quesficns regarding the present <br />status of the Bulldog project or any of the activities summarized for 1995, please contact me in our San Francisco office. My <br />direct telephone line is [415]9838180. <br />Very Truly Yours, <br />~~~~ <br />Alan D. Cox <br />cc: S. Shuey - CDMG -Durango Office <br />H. Barnes - SFO <br />J. Barton - SFO <br />R. Cellan -Grants <br />