Laserfiche WebLink
Proposed 1993 Monitoring <br />xsa~ansxaxxa-ammw~m~.msxsara'ca•.:,x;r~c:'>:s,~ex:~u.~ra:ra:m,'att~ar.~r:~.: ~a:: ~rsn..:;s: n^.~.:~ssa~x::;: z xamx;a:,.,: c::z:s:a::a.::;xxmr> <br />^ With the reclamation phase of the mine now complete, surface water monitoring of water <br />quantity will continue on a quarterly frequency and water quality sampling will continue on <br />' a semiannual frequency with the same parameters. NPDES sampling and monitoring will <br />be continued as required by that permit. Anew NPDES permit (No. CO-G-850034) has <br />' been issued for the mine for the next five year period. Groundwater monitoring will also <br />be resumed in the alluvial and spoils aquifer at the site. Frequency will be quarterly for <br />water levels and semi-annually for water quality. <br />1 <br /> <br />1 <br />6 <br />